Electrical Engineering Department
can both accomplish individual projects and contribute to
integrated engineering tasks. Project planning is exercised
generally for new construction as well as for objects under
rebuilding and upgrading. The major areas of engineering are as
follows:
- 10(6) kV indoor switchgears, 0.4 kV switchgears, 0.4 kV power
control switchboards;
- 0.4-110 kV overhead transmission lines;
- 0.4-10 kV cable power lines;
- 0.4-10 kV supply and distribution networks;
- indoor and outdoor electric lighting systems;
- 110/35/10 kV transformer stations;
- substructure electrochemical protection;
- lightning-discharge protection and grounding;
- relaying and automation calculations.
Major projects:
- "Starolikeevo" line operations dispatcher station. Major repair
of 35 kV overhead transmission line;
- "Jamburgskaya" gas refrigeration station compressor plant.
Captive power plant. 10 kV indoor switchgear reconstruction;
- "SRTO-Torzhok" gas-main pipeline. "Sindorskaya" booster
station. 10 kV indoor switchgear reconstruction;
- "Aleksandrovskaya-Anzhero-Sudzhensk" oil-main pipeline.
"Parabel" oil pump station. Power control switchboard # 34
reconstruction;
- Teleautomation of the "Oil and Gas Refinery
Plant-Parabel-Kuzbass" gas transmission pipeline owned by LLC
"Gazprom Transgaz Tomsk".
- Booster compressor station #1. Novosibirsk District Oil
Pipeline Agency. "Anzherskaya" line operations dispatcher station.
Reconstruction;
- JSC "Seversky vodokanal". Building #1 and Building #2
lightning-discharge protection and grounding.
- "Primorsk" commercial seaport. Sea terminal for refined
oil-product transshipment. Power supply (powered from existing
networks owned by JSC "Transneft"). Reconstruction.
- 110/6 kV substation. Control current system with battery and
rectifier unit changing. Omsk District Oil Pipeline Agency.
"Barabinskaya" line operations dispatcher station. Major
repair.